Analisis Laju Fouling pada Tube Heat Exchanger 53 EA-1001
Abstract: Appliance of Heat
Exchanger type 53 EA-1001 exist in company PT. Pupuk Iskandar Muda operate the time
some long time is hence formed by coat of fouling, existence of fouling will
lessen the hot coefesien transfer totally (U) to a point appliance planning
reach the minimum price, this information is obtained to can to schedule for
the periodic routine of sweeping as well as commutation of pipe of appliance of
heat exchange which is improper used again by prediction is maximum gather
fouling at appliance of Heat Exchanger. Existence of fouling will lessen the
final hot coeffesient transfer to a point planning, so that can be scheduled
forby a routine treatment. Hot influence Coeffesient transfer totally ( U) to
fluid flow speed, resulting height of stream speed. 8640 hour operate for at
fouling factor 0,0082 (Rd) yield the volume fouling 0,0066 m3 need thetreatment
of age Heat Exchanger 27th year of gagging fouling at volume 63,585 m3. Stream
emiting a stream is laminar with the value 950 Btu.ft3 / hr.lb.s energy and
1,46 times from missing energy in the situation without there is fouling.
Penulis: Yasir Amani, M. Ilham
Maulana
Kode Jurnal: jptmesindd160176