ABSTRACT: The development of
world construction projects at this time that established by widespread methods
of physical implementation which more excellent and sophisticated. The
contractors are competing to obtain optimum results, and reduce losses more
lower. The results obtained should not give benefit one person only, the other
one should not to lose and suffer. Islam guides human how they work give
benefit to their own and others. Many methods, equipment, and expertise
deployed by the contractor for their work more optimal, one method for
optimizing the physical implementation of the project is Dynamic Programming.
Dynamic Programming to solve the problem optimization is not only with one
step, but the events that took place linked to each other. Case study in this
paper is the application of dynamic programming of implementation method of
concrete casting on floor slab of Green House building, it’s belongs to
Department of Biology, UIN Maliki Malang with backward induction phase. In
modern century as this era has many fast-growing method of implementation that
are categorized as advanced, but the problem that the methods actually optimal
in terms of cost and time, due to cost and time parameters are very important
in the progress of construction projects. The methods is very sophisticated so
make project to be done very fast but it is very expensive financing, or the
method is still conventional and traditional so that project costs will be
reduced as cheaply, but the project need long time to be finished. Where is the
decision that one will be expected to demand that we use what method.
Mathematical formulas of dynamic programming as recursive equation with change
big problem into smaller sub-problems, so the completion of smaller problems
will be found solving of the original problem. Optimization process in this
case that slab casting which solved in two methods, manually calculations with
a recursive formula and use software DS Win 2.0. Optimization result of the two
method are compared, and the two method produce similar results. Optimal or not
parameter of the two method is optimum time and cost.