MODEL OPTIMASI PENJADWALAN PRODUKSI F LOWS HOP DENGAN WAKTU PROSES DINAMIS

ABSTRACT: In a mass production system, work stationsare designed base on the production process flow. This  layout  is  called  flowshop.  The  advantage  of  flowshoplays  on  it  simple  material  flow. Therefore,  the  material  transportation  time  can  be  minimized  and  the  total  production  time  is shortened  respectively.  Generally,  flowshop  scheduling  applies  Johnson  algorithm,  Campbell, Dudek and Smith (CDS). Nevertheless, those algorithms are just an approach. Therefore it can’t provide  an  optimal  solution.  This  article  explain  the  flexible  flowshop  scheduling  with  Mixed Integer Programming (MIP). Every parts type scheduled will not enter the same work station and some  work  station  are  served  manually  by  an  operator  that  leads  to  a  dynamics  process  time. Simulation is applied to estimate the process time in those work station. A case study is utilize for this  purpose.  The  makespan  of  the  proposed  model  exhibits  a  14  minutes  shorter  that  the  initial time.
Keywords: Scheduling, Flexible Flowshop, Optimization, Makespan, Mixed Integer Programming
Penulis: Joko Sulistio
Kode Jurnal: jptindustridd150364

Artikel Terkait :