ANALISIS PEMBANGKIT LISTRIK TENAGA ANGIN DI DESA SUNGAI NIBUNG KECAMATAN TELUK PAKEDAI KABUPATEN KUBU RAYA
ABSRACT: West Borneo province is
very broad and many the
villages have not
gotten the electricity. Energy
sources used to
to generate electricity up to now
is still dominated by fossil fuels. The
wind is renewable energy source and environmently friendly that
has the potential
to replace fossil fuels
and that potential
is widely available in
the west Borneo.
This thesis discussed about
analysis the wind
power plant which is
located in the
Sungai Nibung village especially for house of
worship ( mosque ) and patrol post.
The methods used in the
completion of this thesis
is assisted by
Homer Software to determine the feasibility of building a wind power plant in
the village with
Electric Generator(generator) with
a capacity equal
to the wind turbin
as a comparison which will see
the numberof NPC (Net Present
Cost ) and
the lowest COE (Cost
Of Energy). Based on the
simulation resultsof two
power plant that is the wind
power plant and the generator
( generator )
with 500 watts capacity obtained
the NPC for
wind turbins $ 3.857 ( Rp 48.212,5 ) , coe $ 0.314 / kwh ( Rp 3.925
/ kwh )
and for genarator
electricity ( generator ) the npc $ 6.003 (Rp 75.037,5 ) , coe $ 0.489 / kwh ( Rp 6.112,5 / kwh ). Meanwhile
for electricity generating 1000
Watt capacity for Wind
Turbin NPC obtained
for $ 5,386 (Rp 67
325), coe $ 0.439 / kwh ( Rp 5.487,5 / kwh ) and for an electric generator
( generator ) the value of the npc $ 9.758 ( rp 121.975 ) , coe $ 0.795 / kwh (
rp 9.937,5 / kwh ). In accordance with the data peak load of 285
watts, therefore the wind power plant
with 500 watts
capacity is appropriate to
develop in the
Sungai Nibung village.
Penulis: Syamsul Bahari
Kode Jurnal: jptlisetrodd150156