Line Assembling Investigation of Three Wheels Bicycle Using Time Measurement Method at Pt X
Abstract: Production activities
always require the
best method, the
best place and
the best time.
Time analysis required
to determine the length
of time to
complete work. PT
X is one
medium enterprise company
in Indonesia assembles
a three wheels bicycle type
F-586. Based on the production floor
observation known that the
assembly process of the three wheels bicycle
done manually. Unbalance
of task at
work stations make
the assembling process
takes longer time
than it should. This study will measure the time of
each working element needed to assembly the product. Observation and measurement describe there
are 31 of working elements. The average of the longest working element time
take place at element no.23 is 304
seconds and the average of the shortest
working element time take place at element no.2 is 2.83
seconds. The largest standard deviation
is equal to 1.66 second take place
at working element
no. 24 and for the smallest standard deviation is 0.27 second take place
at working element no 13.
Author: I Wayan Sukania, Iwan
Susanto
Journal Code: jptindustrigg120004