PENGUKURAN KINERJA MESIN DEFEKATOR I DENGAN MENGGUNAKAN METODE OVERALL EQUIPMENT EFFECTIVENESS (Studi Kasus pada PT. Perkebunan XY)
Abstract: It
takes a good
maintenance management at
any company to be
able to run
the production process
effectively and efficiently. However, in practice often attempt
maintenance or repair only be a
waste, because the maintenance
team does not know
clearly the problems
that occur and
the factors. The
purpose of this
study was to
measure the value
of Overall Equipment Effectiveness
(OEE), determine the
magnitude of each
factor of six
big losses that affect the effectiveness of
the defekator I
machine, and an
analysis of the factors
that a top priority
as the basis
for repairs. In this study the method used Overall Equipment
Effectiveness (OEE), and OEE six big losses to measure the performance of the machine
for six months and to determine the factors of the six factors in the six big
losses that give the most impact on the effectiveness of
the defektor I
machine. Based on
the results of
data processing, Overall
Equipment Effectiveness value defekator I machine in purification
station PT. Perkebunan XY, the ideal
situation is achieved only in August and October with OEE
value of 85.53%
in August and
85.29% in October. Meanwhile, in
June, July, September,
and November OEE values
are respectively 84.87%,
80.47%, 84.63%, and
76.89%. The results
of the calculation
of the six
big losses, it is known
that loss and rework loss breakdown is a factor with the largest percentage for
the low effectiveness of the defekator I machine with a percentage of 63.57%
for the breakdown loss and rework a loss of 24.23%. OEE and OEE value of six
big losses are the basis for the provision of the proposed improvement.
Penulis: Saiful, Amrin Rapi,
Olyvia Novawanda
Kode Jurnal: jptindustridd140151