INTEGRASI FRAME WORK RISK AND INSURANCE MANAGEMENT SOCIETY (RIMS) DALAM ANALISIS KEMATANGAN IMPLEMENTASI MANAJEMEN RISIKO (STUDI KASUS: PLTA MANINJAU)

Abstract: Indonesia electrical energy consumption growth that reached 9.2% per year requires every plant to always pursue consistent and sustainable improvement to be able to cope with the growth. Maninjau Hydropower is one of the assets of strategic energy resources to meet the electrical  energy  supply,  especially  for  the  southern  Sumatera  region.  Risk  management  in Maninjau  hydropower  take  place  without  any  standard  of  measurement  standards,  so management and risk management actors do not have an overview and guide to improve the performance of the risk management activities. In this study, a standard measure used is to measure the level of maturity of the risk management implementation using the framework of  the  Risk  and  Insurance  Management  Society  (RIMS)  for  Enterprise  Risk  Management (ERM). Measurements carried out for the realization of the value and the expected value of risk  management  implementation  in  Maninjau  hydropower,  as  well  as  designing  the evaluation  chart  implementation  of  risk  management  by  integrating  Key  Risk  Indicators (KRI)  from  the  expected  value.  Based  on  the  results  of  the  measurements  made,  it  was found that the actual implementation of risk management in Maninjau hydropower located on the third level (repeatable), while the implementation of the expectation value is found to be at the highest level (leadership), and the percentage achieving overall expectation value has reached  62%.  The  draft  also  raises  the  risk  evaluation  chart  15  Key  Risk  Indicators  to  be achieved by Maninjau hydropower to achieve the expected value at the leadership level.   
Keywords: Risk Management, RIMS for ERM, KRI
Penulis: Taufik, Ahmad Fauzan 
Kode Jurnal: jptindustridd130344

Artikel Terkait :