INTEGRASI FRAME WORK RISK AND INSURANCE MANAGEMENT SOCIETY (RIMS) DALAM ANALISIS KEMATANGAN IMPLEMENTASI MANAJEMEN RISIKO (STUDI KASUS: PLTA MANINJAU)
Abstract: Indonesia electrical
energy consumption growth that reached 9.2% per year requires every plant to
always pursue consistent and sustainable improvement to be able to cope with
the growth. Maninjau Hydropower is one of the assets of strategic energy
resources to meet the electrical
energy supply, especially
for the southern
Sumatera region. Risk
management in Maninjau hydropower
take place without
any standard of
measurement standards, so management and risk management actors do
not have an overview and guide to improve the performance of the risk
management activities. In this study, a standard measure used is to measure the
level of maturity of the risk management implementation using the framework of the
Risk and Insurance
Management Society (RIMS)
for Enterprise Risk
Management (ERM). Measurements carried out for the realization of the
value and the expected value of risk
management implementation in
Maninjau hydropower, as
well as designing
the evaluation chart implementation of
risk management by
integrating Key Risk
Indicators (KRI) from the
expected value. Based
on the results
of the measurements
made, it was found that the actual implementation of
risk management in Maninjau hydropower located on the third level (repeatable),
while the implementation of the expectation value is found to be at the highest
level (leadership), and the percentage achieving overall expectation value has reached 62%.
The draft also
raises the risk
evaluation chart 15
Key Risk Indicators
to be achieved by Maninjau hydropower
to achieve the expected value at the leadership level.
Penulis: Taufik, Ahmad
Fauzan
Kode Jurnal: jptindustridd130344