ANALISIS TIME COST TRADE OFF UNTUK MENGEJAR KETERLAMBATAN PELAKSANAAN PROYEK DI BANDAR LAMPUNG
ABSTRACT: During the execution
of construction projects, often there is a mismatch between the planned schedule
and realization. It could lead to the overruns of the implementation time and
cost. De lays can be overcomed by acceleration of the implementation in order
to achieve the targeted plan. However, in the decision to speed up the
implementation of the work, it is necessary to take into account the expected
results of financing so that the minimum cost achieve without neglecting the
required standards of quality. The alternatives that can be used are the
addition of works and the labors themselves. From the analysis results obtained
that the acceleration that produces the minimum total cost (not including
indirect costs) for the project Lampung Hotel Zodiac is to use more labor, the
total cost and the total duration of each to Rp. 29,523,160,619 be 309 days.
Acceleration to Hotel Park In By Radisson is to accelerate without penalty
using more labor, the total cost and the total duration of each to Rp. 201 974
119 946 and 196 days. While Toko Mitra Hasil Sentosa project is to in crease
working hours, with the total cost and the total duration of each to Rp.
18,348,782,435 and 263 days.
KEYWORD: project acceleration,
time cost trade off, critical path, cost slope, additional working hours,
additional labor