ABSTRACT: Flood is a condition
where water is overflowing in the discharge channel (river) caused by the
inability of the cross section of the river in accommodating the flood
discharge. Serayu river always brings floods every year, especially in the area
of Banyumas and Cilacap. Flood debit plan used in the analysis of a cross
section of Serayu river from the moving weir Serayu to estuary in Cilacap uses
a return period of 50 years. Flood debit plan was analyzed by using SCS-CN
method (Soil Conservation Service - Curve Number) with the help of software
HEC-HMS. From the analysis of flood debit value of the plan, namely: Junction
12 amounted to 2088.4 m3/second, the junction 13 at 2417.1 m3 second, and 15th
junction of 1386.9 m3/second. Existing cross-sectional analysis of Serayu river
was done by using HEC-RAS software. The output of the HEC-RAS software is used
to determine the location of planning the embankment, which is in areas
experiencing river water overflowing. Central Java Serayu Downstream Embankment
planning will be done with an estimated construction cost of Rp.
63,131,000,000.00 (sixty three billion one hundred and thirty one million
rupiah) with a duration of work for 18 weeks.
Penulis: Riade Yusuf Hernanda,
Robert M. Nainggolan, Suseno Darsono, Dwi Kurniani
Kode Jurnal: jptsipildd160235