PERENCANAAN DRAINASE GAYAMSARI SUBSISTEM KANAL BANJIR TIMUR SEMARANG
ABSTRACT: Gayamsari District
Area of Semarang is one of the flooded area. The causes of flooding is local
rainfall that occurred in the village Gayamsari, Pandean Lamper, Siwalan and
Sambirejo which is a sub-system of the East Flood Canal, where the channel
capacity in the area can not accommodate the flow of water passing through the
channel. Limited drainage capacity caused by the blockage of garbage and
sediment that makes the water can not flow when it rains. This causes the drainage
channel over capacity when it rains with great intensity and in a rather long
time, which can result in a puddle with a depth of between 20-50 cm for ± 1-5
hours. To overcome this done drainage planning in order to cope with floods and
inundation in the area. The initial steps of planning a drainage cover primary
and secondary data collection, planning drainage used 14 years of rainfall
data, topographic maps and the existing drainage system. In planning,
hydrological analysis to seek the discharge plan with EPA SWMM program.
Obtained flood discharge plan with a return period of 5 years on each
subcatchment ranged from 0.24 to 3.81 m3 / sec. Furthermore, to determine the
effectiveness of the existing channel cross section is modeled with HEC-RAS
program. Planned cross-section with a steady flow conditions. The results of
calculations using the program shows a cross section in the downstream Gajah
Raya Street and Soekarno-Hatta Street can not accommodate discharge plan.
Handling is done by increasing capacity of the drainage channel and making the
detention basin.
Penulis: Rizki Ade Khoir,
Novita Afrianti Panjaitan, Sri Eko Wahyuni, Hari Nugroho
Kode Jurnal: jptsipildd150199