PENENTUAN UKURAN OPTIMUM KAPASITOR BANK DAN DUMMY LOAD PLTMH DENGAN GENERATOR INDUKSI
Abstract: A technique of
determining the size of the capacitor and dummy load for hydroelectric power
generation system that uses an induction machine as generator is done by
creating a model of the components and systems in Matlab and prepare the
scenario of loading and setting of system parameters in order to obtain the
size of the capacitor and dummy load were optimum at once . The simulation
results can already provide information about the size of all these component
sizes and once inform the maximum active power limit that can be borne by the
generator . In this paper the assignment scenario is purely resistive load and
therefore has not investigated whether the method could also be used to
determine the size of the components of a system in which there are inductive
loads .
Penulis: Andi Setiawan
Kode Jurnal: jptmesindd130362