ANALISIS BOTTLENECK DAN CHARGING COST PADA PEMBUATAN TIANG PANCANG PT. WIKA BETON PPB BOYOLALI
ABSTRACT: To be competitive in
the market competition, then a company is required to be able to work without
defects, especially in the production process, especially in terms of time, but
in the process of production of the most common problem is the bottleneck. In
addition, the process of making the finished product, if the consumer is too
long to take the goods orders will certainly lead to additional cost for the
manufacturer (PT. WIKA Beton Boyolali). Therefore, it is necessary to charge to
cover the cost calculation the amount of cost / additional costs. The purpose
and goal of this study was to maximize the production of piling PT. WIKA Beton
Boyolali, as well as reducing the amount of losses arising from the cost /
surcharge. Bottleneck determination made by the method of calculation of
standard time each work station, while charging for the cost calculation
performed by three methods: Base On Plan, Mixing Pile, Base On Demand. From the
results of the analysis showed that the bottleneck is at the work station spinning,
and to reduce the bottleneck distasiun the work can be done by adding the
spinning tool and also the addition of workers / operators. While charging the
cost of the analysis showed that of the three methods used, the most effective
method is a method Charging Cost Base On Mixing Pile. It is expected to cost
charging system is then the consumer can pay more attention to pick up their
order as soon as possible when the order finished goods.
Penulis: Angga Dwi Setiawan,
Novan Fahlevi, Bambang Riyanto, Rudi Yuniarto
Kode Jurnal: jptsipildd150138