Hubungan Pengetahuan dan Lama Kerja Dengan Ketrampilan Kader Dalam Menilai Kurva Pertumbuhan Balita di Posyandu Kelurahan Tegalsari Kecamatan Candisari Kota Semarang
Abstract: Rising and
descending children under five number who suffered growth obstacle could seen
soon within short time (month) and could further research immediately what
caused of it, and made design in order to take the action to overcome it as
soon as possible. Growth advancement barrier of children weight observe could
seen within growth curve of periodical measurement result recorded and provide
within KMS. One of success Posyandu program especially includes baby number and
children under five who have KMS were influenced by Posyandu cadre’s role.
Knowledge and cadre skill not could increase only but also descending. This
case could occur because cadre less active therefore forget about matters have
been learned therefore their knowledge were descending. The high of knowledge
level and cadre skill were influence by formal education, cadre course,
frequency to participating within program, being active of cadre within
Posyandu and their length being the cadre. Aim of this research was to found
the knowledge and length period of job relationship by cadre skill in order to
valuated children under five growth curve on Posyandu. This research was
analytical survey type by crossectional method. This research carried out at
Posyandu of Tegalsari, Candisari Subdistrict, Semarang city, from January 2011
to July 2011 about 35 cadres of posyandu on Posyandu of Tegalsari, Candisari Subdistrict,
Semarang about 35 cadres. All of population unit were investigated. Sample
within this research was using nonprobability sampling it was collection
technique of population member to elected to be the sample. This sample
technique was saturated sampling it was sample determination technique when all
of population member used as the sample. Research result showed that about
48,6% of knowledge level cadre were good, 37,1% have been length being posyandu
cadre about 16-20 years, whereas skill cadre in valuated children under five
growth curve about 25,7%. There were no relationship between time period of
work being the cadre with cadre skill in valuated children under five growth
curve (p-value = 0,959), but found presence relationship of cadre knowledge
level with cadre skill in valuating children under five growth curve (p-value =
0,001). Cadre in carried out posyandu activities expected could change
assignment therefore within Posyandu, cadre ability in weigh, record and giving
information could carried out by all of cadres and expected for cadre to be
able within all of that sectors.
Penulis: Hamariyana, Agustin Syamsianah, Eny Winaryati
Kode Jurnal: jpkesmasdd130077