PERBAIKAN LAYOUT MESIN PRODUKSI LONGSONG MUNISI MENGGUNAKAN METODE SYSTEMATIC LAYOUT PLANNING DAN BLOCPLAN (Studi Kasus: Divisi Munisi - PT. Pindad (Persero)
Abstract: Layout of the
existing machines using cell system has been applied since 2005 and the machine
operators have known the weaknesses, so it is necessary to improve the layout
of themachines. This study was conducted to improve the machines layout
cartridge case productionby using Systematic Layout Planning and Blocplan with
quantitative and qualitativeconsiderations. The qualitative considerations are
working ergonomies, while the quantitativeconsiderations are the distance of
product routing between one process with the next process and backtracking from
product flow between workstations with another. A qualitative assessmentends to
be based on subjective considerations of each department facitity. Blocplan was
the simple and practical method used in the settlement of this problem.
Blocplan changed the layoutby calculating the minimum total distance traversed
in the movement of the materials betweenworkstations. The application of
Systematic Layout Planning methods and Blocplan in improving the layout and
shortening production time in Hall OP decrease of product displacement distanceis
13.5 meters (13.50%) i.e.: before the improvement was 198.36 meters, after
improvement is171.59 meters. Relayouting of the cell for improving the groups
in the type of process and themachines also creates a higher state of
comfortable working condition.
Penulis: Eddy Kustriyanto,
Ishardita Pambuditama, Yudy Surya Irawan
Kode Jurnal: jptmesindd160664