Identifikasi Waste Pada Proses Produksi Key Set Clarinet Dengan Pendekatan Lean Manufacturing

Abstract: This study discusses lean manufacturing concept to identify waste in Key Set Clarinet production process at Yamaha Musical Products Indonesia, Ltd. The lean manufacturing concept is done intially by big picture mapping, waste assessment model (WAM), value stream mapping (VSM) and cause and effect diagram respectively. The results show that the dominant waste is defect (26.04%), motion (19.34%), inventory (19.22%), and waiting (13.91%).
Keywords: cause effect diagram; lean manufacturing; value stream mapping; waste assessment model
Penulis: Dana Marsetiya Utama, Shanty Kusuma Dewi, Veronika Indah Mawarti
Kode Jurnal: jptindustridd160206

Artikel Terkait :