Analisis Kelayakan Investasi Pengadaan Alat Angkut Material untuk Meminimalkan Biaya Logistik (Studi Kasus: PT. Tiki Cabang Solo)

Abstract: Management of goods in logistics company is required till deliver the goods quickly and accurately, thus it can improve additional value and can compete with other competitors. But, in factthere are many factors that cause delivery delay. It is experienced by PT. TIKI Branch Solo which has adelay in the delivery of goods from the station to the airport. By fishbone diagram, the main cause is thecurrent method of loading/unloading from truck to the station and vice versa it uses manual handling. Then, it affects to the productivity in terms of time and costs. So, the solution is considered such as forklift and trolley to speed up the process of loading/unloading. Both alternatives compared with manual system use financially and technically process. Based on financial result, trolley is the most effective alternativefrom the value of Manual Handling Costs is Rp 6.946,67 and Nett Present Value is Rp 43.752.394,91.Technically, trolley is faster than others as goods movement process can be done effectively and efficiently. Finally, it can solve the problem of delivery delay in PT. TIKI Branch Solo.
Keywords: Logistik, Manual Handling, Fishbone Diagram, Ongkos Material Handling (OMH), Nett Present Value (NPV)
Penulis: Ika Shinta M, Nabila Nur F, dan Christian A. W
Kode Jurnal: jptindustridd160428

Artikel Terkait :