DESAIN TATA LETAK FASILITAS PRODUKSI PADA PENGOLAHAN RIBBED SMOKED SHEET (RSS) DI GUNUNG PASANG PANTI KABUPATEN JEMBER
Abstract: Industrial layout or
production facility is a setting for placing facilities position which
considering space limitation in placing machines, flow of material removal etc.
Generally the optimal layout design is take a part in determining the
efficiency and effectiveness of production activities or maintain the viability
of an Industrial. Basically the main goal of this research is to produce an
optimal layout of production facilities, one of which is to evaluate the
existing layout. The refore we need an optimal facility layout design according
to a good material flow patterns, by following the order of process. Direct
observation at PDP Gunung Pasang Panti Jember Region, showed less precise
placement of production facilities and material flow, causing the displacement
of material handling distances become longer and eventually impact on Total
Movement becomes high. To determine the layout of each department production facilities
in a manner that is efficient use of time study method. As for planning the
layout by using layout verification results by comparing the existing layout as
a parameter events. The results showed a more efficient layout verification
with Total Movement initial displacement distance of 2650.44 meters to 2469.46
meters or the distance may be shortened by 6.83%. As for the time of the
original conveyance of 422.5 seconds to 392.8 seconds or experiencing a savings
of 7.03%.
Penulis: Bambang Herry
Purnomo, Andrew Setiawan Rusdianto, Muhammad Hamdani
Kodee Jurnal: jppertaniandd130491