Analisis Biaya dan Produktivitas Produksi Kayu Pada Hutan Tanaman Industri (Studi Kasus: PT. Sumatera Riang Lestari-Blok I Sei Kebaro, Kabupaten Labuhanbatu Selatan dan Kabupaten Padang Lawas Utara)
Abstract: Analysis of costs
and productivity of timber production is done in PT. Sumatera Riang Lestari. This research was conducted since August 2014
until September 2014. The purpose of this research is to analyze the cost of
harvesting that focus on the stages of harvesting, the division of the stem,
stacking, stripping, extraction, loading and analyzing productivity and
harvesting of timber in HTI PT. Sumatera Riang Lestari. The method of analysis
in the sampling trees is done by purposive sampling. To analyze the cost of
harvesting used calculation formulas fixed costs and variable costs (variable).
To analyze the productivity of harvesting is done by calculating the
productivity of timber extraction from the location of HTI to sawmills with
conveyances (truck). Data in the calculation of costs and productivity of
timber harvesting obtained by direct observationin the field. The research
results showed that the cost of harvesting, fixed and variable costs (variable)
used is IDR 288.243/hour and IDR 398.849,38/hour. Productivity harvesting of
timber obtained in plantation forests (HTI) PT. Sumatera Riang Lestari is
314,80 m3/day.
Keyword: Cost Analysis,
harvesting productivity, Industrial Plantation Forest, PT. Sumatera Riang
Lestari
Penulis: Warsein Roy M. Sitohang,
Muhdi, Yunus Afifuddin
Kode Jurnal: jpkehutanandd160102